What a week! Two of our engineers have been monitoring three 1900kva generators from early in the morning till late the following night. Followed immediately by an emergency callout at another site, so our lads got over there as quickly as possible to help get them sorted. This did mean another all-nighter for the team.
The emergency callout was at a near-by hospital, as their DNO incomer breaker had failed, and were running on stand-by power. The hospital always needs another form of backup power, and with the mains failing due to their own breakers, we worked through the night installing and monitoring a hire set.
As always INGRAM INSTALLATIONS will be there when you need us the most, no matter what time we will always respond, contracted customer or not you can always call us an we will support you.